Babcock begins upkeep of Royal Navy frigate HMS Argyll
During the works, Babcock will overhaul equipment onboard the ship and carry out design changes to cater for new capabilities such as communications upgrades and mixed crewing.
The Type 23 frigate will also be treated to a full spray coat of new paint to the outer bottom and ship side.
The vessel is being prepared for a Lloyds structural survey to achieve an early full ship assessment in as soon as nine weeks.
Argyll is the longest-serving Type 23 frigate and was the first to receive a LIFEX programme in 2015.
Babcock is continuing LIFEX work across the Type 23 fleet with another frigate, HMS Somerset, achieving its ready-for-sea date and commencing trials earlier this year.
HMS Iron Duke was recently undocked, and HMS St Albans is preparing to flood up later this month.
More from Naval Warfare
-
Norway’s aim to purchase new frigates may impact Royal Navy’s own fleet production
The UK Ministry of Defence (MoD) has only so far confirmed that discussions have been taking place with BAE Systems, but a decision has yet to be made, according to The Telegraph.
-
Royal Navy to receive DragonFire laser system
The UK Ministry of Defense (MoD) made the decision to accelerate the laser programme from the demonstrational stage to an operational laser weapon.
-
Royal Navy’s new Dreadnought SSBNs to be equipped with OSI’s ECPINS
The contracts between OSI Maritime Systems (OSI) and BAE Systems Submarines will encompass continued support for the Astute-class nuclear-powered submarines (SSN) and the future Dreadnought-class nuclear-powered ballistic missile submarines (SSBN).